The line has only existed in its current form since 1981; however, most of the line is an amalgamation of lines built in the 19th century. The main section of the current line, between South Tottenham and Woodgrange Park, was built as the Tottenham and Forest Gate Railway, a joint project between the Midland Railway and the London, Tilbury and Southend Railway. This opened on 9 July 1894, linking the Midland and Great Eastern joint line at South Tottenham, and the Forest Gate and Barking line at Woodgrange Park. The section west of South Tottenham was originally built as the Tottenham and Hampstead Junction Railway, which opened in 1868 but had not been commercially successful as a stand alone railway.
| Graph IRI | Count |
|---|---|
| http://dbkwik.webdatacommons.org | 59 |