Placeable on: All Planets (except Kashyyyk and Mustafar) Schematic Obtained In: Trader (Structures) >> Structure Expertise V Skill Needed to Use: None Item Type: Deed >> Installation Number of lots required: 1 Capacity of structure in items: Hopper size depends on expermentation Operating costs: * Power: 50/hr * Maintenance: 60/hr Resources Required: * 200 Steel * 300 Metal * 150 Low Grade Ore * 100 Metal * 200 Chemical Components Required: * 3 similar Wall Modules * 1 Generator Turbine * 1 Small Structure Storage Module * 1 Harvesting Mechanism
| Graph IRI | Count |
|---|---|
| http://dbkwik.webdatacommons.org | 5 |