About: USS Greenling (SSN-614)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : dbkwik.org associated with source dataset(s)

On 10 April 1963, Thresher, the lead ship of Greenling's class, was lost due to severe design flaws in her non-nuclear piping systems. Because she was still early in the construction process, Greenling was one of three selected Thresher-class submarines selected for conversion to the "improved Thresher class." She was launched on 4 April 1964 sponsored by Mrs. H.C. Bruton. On 29 April, she was towed to Quincy, Massachusetts, for lengthening and submarine safety program (SUBSAFE) modifications. Modifications included increased buoyancy and adding 13 feet 9 inches of length to the hull, providing improved living and working conditions for the crew and space for additional equipment. Before construction of Greenling was completed, she and her sister ships were redesignated the Permit class, a

AttributesValues
rdf:type
rdfs:label
  • USS Greenling (SSN-614)
rdfs:comment
  • On 10 April 1963, Thresher, the lead ship of Greenling's class, was lost due to severe design flaws in her non-nuclear piping systems. Because she was still early in the construction process, Greenling was one of three selected Thresher-class submarines selected for conversion to the "improved Thresher class." She was launched on 4 April 1964 sponsored by Mrs. H.C. Bruton. On 29 April, she was towed to Quincy, Massachusetts, for lengthening and submarine safety program (SUBSAFE) modifications. Modifications included increased buoyancy and adding 13 feet 9 inches of length to the hull, providing improved living and working conditions for the crew and space for additional equipment. Before construction of Greenling was completed, she and her sister ships were redesignated the Permit class, a
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship image
  • 300(xsd:integer)
module
  • --06-09
abstract
  • On 10 April 1963, Thresher, the lead ship of Greenling's class, was lost due to severe design flaws in her non-nuclear piping systems. Because she was still early in the construction process, Greenling was one of three selected Thresher-class submarines selected for conversion to the "improved Thresher class." She was launched on 4 April 1964 sponsored by Mrs. H.C. Bruton. On 29 April, she was towed to Quincy, Massachusetts, for lengthening and submarine safety program (SUBSAFE) modifications. Modifications included increased buoyancy and adding 13 feet 9 inches of length to the hull, providing improved living and working conditions for the crew and space for additional equipment. Before construction of Greenling was completed, she and her sister ships were redesignated the Permit class, after the eldest surviving member of the class. Greenling was commissioned on 3 November 1967 with Commander Guy H.B. Schaffer in command.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software