About: Mitcham Eastfields railway station   Sponge Permalink

An Entity of Type : dbkwik:resource/ECOSrkzu2pwtEk9OZ4oF-w==, within Data Space : dbkwik.org associated with source dataset(s)

Proposals for the station have apparently existed since the 1930s. Planning permission was granted by the London Borough of Merton in August 2007. Construction started in October 2007. Following consultation, there were hopes to have the station open by December 2007.

  • Eastfields and Mitcham
  • AttributesValues
    rdf:type
    rdfs:label
    • Mitcham Eastfields railway station
    rdfs:comment
    • Proposals for the station have apparently existed since the 1930s. Planning permission was granted by the London Borough of Merton in August 2007. Construction started in October 2007. Following consultation, there were hopes to have the station open by December 2007.
    sameAs
    image name
    • Mitcham Eastfields stn building.JPG
    dcterms:subject
    dbkwik:uk-transpor...iPageUsesTemplate
    dbkwik:uktransport...iPageUsesTemplate
    Previous
    Platforms
    • 2(xsd:integer)
    fare zone
    • 3(xsd:integer)
    Events
    • Opened
    Name
    • Mitcham Eastfields
    Manager
    borough
    Caption
    • Station building, to the north of the level crossing on Eastfields Road
    access
    • yes
    Peckham Rye
    • y
    railexits
    • 0(xsd:double)
    • 0(xsd:double)
    • 0(xsd:double)
    • 0(xsd:double)
    Symbol
    • rail
    Years
    • 2008-06-02(xsd:date)
    SE None
    • y
    Latitude
    • 51(xsd:double)
    Longitude
    • 0(xsd:double)
    NEXT
    CityMetro
    • y
    Mole Valley
    • y
    railcode
    • MTC
    Route
    abstract
    • Proposals for the station have apparently existed since the 1930s. Planning permission was granted by the London Borough of Merton in August 2007. Construction started in October 2007. Following consultation, there were hopes to have the station open by December 2007. The opening was originally scheduled for 19 May 2008 but that date was subsequently put back because Network Rail did not feel the station would be ready until early June. The opening was then planned for the morning of Monday 2 June, but in the event it was delayed till the afternoon by safety inspections. It finally opened at 16:00 and the first train arrived at 16:11.
    is Previous of
    is NEXT of
    Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
    This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
    OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
    Data on this page belongs to its respective rights holders.
    Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software