About: STS-104   Sponge Permalink

An Entity of Type : dbkwik:resource/G7YR4yAvfoe7I_ap4nmguQ==, within Data Space : dbkwik.org associated with source dataset(s)

STS-104 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. Its primary objectives were to install the Quest Joint Airlock and help perform maintenance on the International Space Station. It was successful and returned to Earth without incident, after a successful docking, equipment installation and three spacewalks.

AttributesValues
rdf:type
rdfs:label
  • STS-104
rdfs:comment
  • STS-104 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. Its primary objectives were to install the Quest Joint Airlock and help perform maintenance on the International Space Station. It was successful and returned to Earth without incident, after a successful docking, equipment installation and three spacewalks.
sameAs
COSPAR ID
  • 2001(xsd:integer)
dcterms:subject
dbkwik:nasa/proper...iPageUsesTemplate
crew EVA duration
  • 59400.0
crew4 up
Previous Mission
crew size
  • 5(xsd:integer)
landing date
  • --07-25
flights1 up
  • Third
SATCAT
  • 26862(xsd:integer)
Mission Duration
  • 1103799.0
crew photo caption
  • Left to right: Seated - Charles O. Hobaugh, Steven W. Lindsey; Standing - Michael L. Gernhardt, Janet L. Kavandi, James F. Reilly
Name
  • STS-104
crew1 up
crew3 up
terminology
  • Astronaut
Insignia
  • Sts-104-patch.png
Image caption
  • Atlantis docked to the Destiny laboratory on the ISS, taken from atop the P6 truss during an EVA
crew photo
  • STS-104 crew.jpg
orbit period
  • 5532.0
orbit inclination
  • 51(xsd:double)
crew2 up
docking
  • --07-14
Operator
flights3 up
  • Fourth
crew EVAs
  • 3(xsd:integer)
launch site
crew5 up
Mission Type
  • ISS assembly
flights2 up
  • First
landing site
apsis
  • gee
orbit regime
Programme
Launch date
  • --07-12
flights4 up
  • Third
crew members
Position
  • Pilot
  • Commander
  • Mission Specialist 1
  • Mission Specialist 2
  • Mission Specialist 3
orbits completed
  • 200(xsd:integer)
flights5 up
  • Second
Next Mission
orbit reference
abstract
  • STS-104 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. Its primary objectives were to install the Quest Joint Airlock and help perform maintenance on the International Space Station. It was successful and returned to Earth without incident, after a successful docking, equipment installation and three spacewalks.
is Previous Mission of
is Missions of
is Mission of
is Next Mission of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software