One of the components of the Bow Back Rivers. As part of the 1930s scheme, Three Mills Back River was filled in, and a flood relief channel called Prescott Channel was built which enabled flood flows to bypass the mills when required. The new channel incorporated a sluice, which maintained the water levels normally, so that the mills could still operate For the Three Mills Wall River Weir [1] See also Three Mills
| Attributes | Values |
|---|---|
| rdfs:label |
|
| rdfs:comment |
|
| dcterms:subject | |
| abstract |
|